| Course Snapshot & Objectives

Objectives:Upon completion of this module, the learner will: - Be familiar with the methods used for the direct burial of plastic pipe according to DOT Regulations 192.321 and 192.375.
- Be familiar with the procedures used in direct burial of plastic pipe.
- Understand the recommended procedures for tie-ins and tapping service punch tees according to DOT Regulations 192.367 and 192.627.
- Be able to determine when squeezing plastic pipe is desirable, as well as be able to follow the squeeze-off procedure to complete the operation.
- Determine when it is desirable to insert plastic pipe in an existing line, as well as be able to follow the plastic pipe insertion procedure.
- Explain the procedure for pressure testing mains and services.
- Understand and be able to perform the procedure for purging mains according to DOT Regulation 192.629.
- Understand the procedures involved in repairing PVC pipe according to DOT Regulation 192.281.
|