| Course Snapshot & Objectives

Course Objective:Upon completion of this course, operating personnel will be able to:- Describe and perform DOT Regulation 195.252 excavation backfilling requirements for liquid pipeline operations.
- Describe and perform DOT Regulation 195.410 requiring liquid pipeline operators to locate, install, and maintain permanent pipeline marker signs.
- Describe DOT Subpart H - Corrosion Control Regulation 195.569(e) that requires liquid pipeline operators to perform a pipe inspection for evidence of external corrosion any time a pipeline is uncovered.
- Describe and perform DOT Regulation 195.440 that requires that liquid pipeline operators establish a continuing education program.
- Describe DOT Regulation 195.442 that requires liquid pipeline operators to have a written damage prevention program.
- Describe how one-call systems operate and state the responsibilities of the pipeline operator, excavator/contractor, and one-call center for successful facility locates.
- Describe and perform temporary pipeline marking using flags and marking paints, including timing and expiration of temporary markings.
- Describe symbols typically used to temporarily mark pipelines and typical pipeline location methods.
- State the qualifications required to successfully and safely perform pipeline location and marking, including required skills and knowledge.
- Describe the process used to safely excavate near a pressurized pipeline, including an explanation of the proper "safety buffer" zone around the pipeline.
- Describe the Abnormal Operating Conditions, recognition, and reactions associated with temporarily and permanently marking pipelines.
|